RELATIVE DISTANCE FROM THE HOME FIELD036912HOME FIELDStations, cities and the bulk of the stockpileBASEFIELD IIThe richest ground heldCOREFIELD IIIFour mining operations based hereCOREFIELD IVWorked on a decay clockCOREFIELD VHighest income, smallest depositsMINEFIELD NAMES AND COORDINATES ARE NOT PUBLISHED

THE FIELDS

Asteroid operations

Nine fields, one home. Everything the asteroid programme does runs out of a single field and comes back to it.

The home field carries the stations, the bulk of the raw material and the survey fleet. Every other field is measured by how far it sits from that point and by what it holds that the home field does not.

THE WORKING SET

Home fieldBaseStations, cities and the stockpile. Everything stages through here, and most of the Duracrete sits in it.
Field II5.10 outThe richest ground held — over half the Meleenium and the only Varium in the estate. No Duracrete at all, which is why it and the home field are a pair rather than a choice.
Field III9.90 outFour mining operations based here. Durelium, Nova and Ardanium.
Field IV9.90 outNova and Varmigio in volume. Carries more decaying deposits than any other field, so it is worked against a clock.
Field V11.18 outFive cities and the highest income of any field, but the deposits are small. Mined, not prospected.
Field designations, coordinates and deposit locations stay inside the roster. Nothing on this page will help anyone find the ground, and that is deliberate.

SURVEY AND MINING

Both jobs are flown. Asteroid fields are prospected and worked from Mining Barques and Y-8 Mining Vessels — there is no ground crew on a rock, only a deck and a survey pattern.

Ten operations run at any time against a hundred and seven live deposits holding some ten million units of ore. Deposits decay in about six months whether or not they are touched, and the field regenerates afterwards and can be surveyed again.

Which means the shortage is not ore and never has been. At present throughput, the ground already surveyed would take four years to work through and it will not last one. The job is not to find more — it is to take more, faster, before the clock runs down on what is already found.

THE CEILING

Material in stock and material still in the ground together cover another seventy-six cities at the tightest constraint. That is what the recruitment is for. The limit on this programme is not ore and has not been for some time — it is hands.